1. Jalil AA, Jaafar M, Mydin MAO, Nuruddin AR (2017) The application of procurement systems in IBS housing project. Int J Supply Chain Manage 6(4). https://www.scopus.com/record/display.uri?eid=2-s2.0-85039984136&origin=inward&txGid=5778783305971f4dd4304c385a8a5611&featureToggles=FEATURE_NEW_DOC_DETAILS_EXPORT:1,FEATURE_EXPORT_REDESIGN:0
2. Mahbub R (2016) Framework on the production and installation of industrialized building system (IBS) construction approach in Malaysia. In: 4th annual international conference on architecture and civil engineering (ACE 2016)
3. Construction Industry Development Board (CIDB) (2015) Construction industry master plan 2 (CIMP 2 2016–2020). CIBD, Ministry of Works Malaysia, Kuala Lumpur
4. Construction Industry Development Board (CIDB) (2015) Input-output table. CIBD, Ministry of Works Malaysia, Kuala Lumpur
5. Fateh MAM, Mohammad MF (2017) Industrialized building system (IBS) provision in local and international standard form of contracts. J Construct Devel Countries 22(2):67–80