1. Fuchigami HY, Range S (2018) A survey of case studies in production scheduling: analysis and perspectives. J Comput Sci 25:425–436
2. Stützle T, Ruiz R (2018) Iterated greedy. In: Handbook of heuristics, pp 547–577
3. Gupta MS (2017) Optimization: the road ahead for the process industries | ARC Advisory Group ARCVIEW. https://www.arcweb.com/blog/optimization-road-ahead-process-industries. Last accessed 2022/10/03
4. State of Mathematical Optimization Report (2021) https://www.gurobi.com/wp-content/uploads/2021/01/State-Of-Mathematical-Optimization-Report-2021.pdf. Last Accessed: 2022/10/03
5. Shahmaleki P, Figlali A (2021) A heuristic algorithm for workforce scheduling with synchronization constraints and ergonomic aspects at cross-dock platforms. Sakarya University J Sci 25(1):113–128