1. Ishimi G, Shiraishi S, Nazato K (1996) Characteristics of motions of a caisson for breakwater during installation and limit condition of works at ocean-facing ports. Technical Note of the Port and Harbour Research Institute, Ministry of Transport
2. Yoneyama H (2003) A study on limit conditions for installation of breakwater caissons by numerical simulation of motions. In: Proceedings of civil engineering in the ocean, vol 19, pp 659–664
3. Kotake Y, Matsumura A, Kumagai Y, Umetsu J, Nakamura T (2017) Study on the reration between the behaviour of floating caissons in wave fields and the limit wave conditions to halt installing operation. In: Proceedings of the Japanese conference on coastal engineering, vol 73, no 2
4. Shibutani Y, Sato A, Yamano T, Kotake Y, Nakamura T (2018) Study on improvement of construction precision during the installation of breakwater caisson using a real time wave monitoring system. In: Proceeding of the Japanese conference on coastal engineering, vol 74, no 2, pp 623–628
5. Takagi A, Watanabe M, Arikawa T (2021) Motion of floating caisson using 3D numerical wave tank. In: Proceeding of the Japanese conference on coastal engineering, vol 77, no 2, pp 775–780