Author:
Zhang Yaning,Li Xiao,Wu Chengke,Chen Zhi
Publisher
Springer Nature Singapore
Reference31 articles.
1. Razkenari, M., Bing, Q., Fenner, A., Hakim, H., Costin, A., Kibert, C.J.: Industrialized construction: emerging methods and technologies. 352–359 (2019)
2. Razkenari, M.A., Fenner, A.E., Hakim, H., Kibert, C.J.: Training for Manufactured Construction (TRAMCON) – Benefits and Challenges for Workforce Development at Manufactured Housing Industry, Modular and Offsite Construction (MOC) Summit Proceedings (2018)
3. Li, C.Z., Xu, X., Shen, G.Q., Fan, C., Li, X., Hong, J.: A model for simulating schedule risks in prefabrication housing production: a case study of six-day cycle assembly activities in Hong Kong. J. Clean. Prod. 185, 366–381 (2018)
4. Li, X., Wu, C., Xue, F., Yang, Z., Lou, J., Lu, W.: Ontology-based mapping approach for automatic work packaging in modular construction. Autom. Constr. 134, 104083 (2022)
5. Chen, Z., Demeulemeester, E., Bai, S., Guo, Y.: Efficient priority rules for the stochastic resource-constrained project scheduling problem. Eur. J. Oper. Res. 270(3), 957–967 (2018)