1. Bensmain, Y., Dahane, M., Bennekrouf, M., et al.: Preventive remanufacturing planning of production equipment under operational and imperfect maintenance constraints: a hybrid genetic algorithm based approach. Reliab. Eng. Syst. Saf. 185, 546–566 (2019)
2. Song, S., Wang, W., Ke, Q.: Optimization design of predecisional remanufacturing based on structure coupling matrix. Comput. Integr. Manuf. Syst. 23(4), 744–752 (2017)
3. Ke, Q., Wang, H., Liu, G., Song, S.: Timing decision-making analysis method for proactive remanufacturing based on performance parameters. China Mech. Eng. 27(14), 1899–1904 (2016)
4. Qin, X., Hua, Z., Zhigang, J., et al.: A decision-making method for active remanufacturing time based on environmental and economic indicators. Int. J. Online Biomed. Eng. 12(12), 32–37 (2016)
5. Le, Chen, et al.: Timing decision-making method of engine blades for predecisional remanufacturing based on reliability analysis. Front. Mech. Eng. 14(4), 412–421 (2019)