1. Bates E, Akindele F, Sprinkle D (2002) American creosote site case study: solidification/stabilization of dioxins, PCP, and creosote for $64 per cubic yard. Environ Prog 21(2):79–84
2. Bone BD, Barnard LH, Boardman DJ, Carey PJ, Hills CD, Jones HM, MacLeod CL, Tyrer M (2004) Review of scientific literature on the use of stabilization/solidification for the treatment of contaminant soil, solid waste and sludges. Environment Agency, Bristol
3. Channel MG, Preston KT (1996) An evaluation of solidification/stabilization for treatment of petroleum hydrocarbon contaminated sludge from Fort Polk Army Installation, Lousiana. US Army Corps of Engineers, Miscellaneous Papers, EL 96-9
4. Chwalibog A, Carrillo-Sheridan M, Schifano V (2012) In-situ solidification/stabilization (ISS) treatability testing and implementation at former manufactured gas plant sites. In: MGP 2012 conference, Chicago
5. EPRI (2000) In-situ solidification and stabilization at former MGP sites. Final report 1000727