Author:
Yin Yue,Zhang Youzhi,Liu Zhenyu
Reference39 articles.
1. Luo, L., Shen, G. Q., & Xu, G. (2019). Stakeholder-associated supply chain risks and their interactions in a prefabricated building project in Hong Kong[J]. Journal of Management in Engineering, 05018015, 1–14.
2. Baldwin, A., Poon, C. S., & Shen, L. Y. (2009). Designing out waste in high-rise residential buildings: Analysis of precasting methods and traditional construction. Renewable Energy, 9(34), 2067–2073.
3. Chiang, Y. H., Hon-Wan Chan, E., & Ka-Leung, L. L. (2006). Prefabrication and barriers to entry—A case study of public housing and institutional buildings in Hong Kong. Habitat International, 3(30), 482–499.
4. Mao, C., Xie, F., & Hou, L. (2016). Cost analysis for sustainable off-site construction based on a multiple-case study in China. Habitat International, 57, 215–222.
5. López-Mesa, B., Pitarch, Á., & Tomás, A. (2009). Comparison of environmental impacts of building structures with in situ cast floors and with precast concrete floors. Building and Environment, 4(44), 699–712.