Determination of Project Management Competence Risks in Build Operate Transfer (BOT) Transportation Projects
Author:
Publisher
Springer Singapore
Link
http://link.springer.com/content/pdf/10.1007/978-981-10-6190-5_57
Reference28 articles.
1. Abednego MP, Ogunlana SO (2006) Good project governance for proper risk allocation in public–private partnerships in Indonesia. Int J Project Manage 24(7):622–634
2. Babiak K, Thibault L (2009) Challenges in multiple cross-sector partnerships. Nonprofit Voluntary Sector Q 38(1):117–143
3. Boeing Singh L, Kalidindi SN (2006) Traffic revenue risk management through annuity model of PPP road projects in India. Int J Proj Manage 24(7):605–613
4. Chai J, Liu JN, Ngai EW (2013) Application of decision-making techniques in supplier selection: a systematic review of literature. Expert Syst Appl 40(10):3872–3885
5. Chan WT, Chen C, Messner JI, Chua DK (2005) Interface management for China’s build–operate–transfer projects. J Constr Eng Manage 131(6):645–655
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3