Publisher
Springer Nature Singapore
Reference36 articles.
1. U. Ministry of Economy: Annual Economic Report of government of the United Arab Emirates (UAE), Abu Dhabi, United Arab Emirates (UAE) (2018)
2. Algheth, A., Sayuti, M.I.: Contributing factors to schedule delays in construction projects in the United Arab emirates. Int. J. Eng. Adv. Technol. 8(6, Special Issue 3), 422–433 (2019). https://doi.org/10.35940/ijeat.F1076.0986S319
3. Takim, R., Akintoye, A.: Performance indicators for successful construction project performance. In: 18th Annual ARCOM Conference, vol. 2, no. September, pp. 545–555 (2002)
4. Alias, Z., Zawawi, E.M.A., Yusof, K., Aris, N.M.: Determining critical success factors of project management practice: a conceptual framework. Procedia. Soc. Behav. Sci. 153, 61–69 (2014). https://doi.org/10.1016/j.sbspro.2014.10.041
5. Chan, A.P.C., Scott, D., Chan, A.P.L.: Factors affecting the success of a construction project. J. Constr. Eng. Manag. 130(1), 153–155 (2004). https://doi.org/10.1061/(asce)0733-9364(2004)130:1(153)