Author:
Ma’ruf Anas,Gultom Shinta Uli Agnes Monica
Publisher
Springer Nature Singapore
Reference12 articles.
1. Martignago M, Battaïa O, Battini D (2017) Workforce management in manual assembly lines of large products: a case study. IFAC-PapersOnLine 50(1):6906–6911
2. Eberlein S, Freitag M (2022) A pull principle for the material supply of low-volume mixed-model assembly lines. Procedia CIRP 107:1385–1390
3. Pilati F, Faccio M, Cohen Y (2021) Absenteeism and turnover as motivation factors for segmenting assembly lines. IFAC-PapersOnLine 54(1):613–616
4. Wan XQ, Yan H, Sen, Wang Z (2015) Scheduling and self-reconfiguration of an aircraft engine assembly line in knowledgeable manufacturing. Zidonghua Xuebao/Acta Automatica Sinica, 41(1)
5. Li T, Lockett H (2017) An Investigation into the interrelationship between aircraft systems and final assembly process design. Procedia CIRP 60:62–67