Author:
Permatasari Hani Aninda Intan,Rosyidi Cucuk Nur,Laksono Pringgo Widyo
Publisher
Springer Nature Singapore
Reference14 articles.
1. Badri HM, Khamis HM, and Ghazali MJ (2020) Integration of lot sizing and scheduling models to minimize production cost and time in the automotive industry. Int J Ind Optim 1(1):1–14
2. Almada-Lobo B, Klabjan D, Carravilla MA, and Oliveira JF (2010) Multiple machine continuous setup lotsizing with sequence-dependent setups. Comput Optim Appl 47(3):529–552. https://doi.org/10.1007/s10589-009-9235-8
3. Ramezanian R, Saidi-Mehrabad M, and Teimoury E (2013) A mathematical model for integrating lot-sizing and scheduling problem in capacitated flow shop environments. Int J Adv Manuf Technol 66:1–4:347–361. https://doi.org/10.1007/s00170-012-4329-3.
4. Pinedo ML (2008) Scheduling: theory, algorithms, and systems
5. Liu M, Wang S, and Chu C (2013) Scheduling deteriorating jobs with past-sequence-dependent delivery times. Int J Prod Econ 144(2):418–421. https://doi.org/10.1016/j.ijpe.2013.03.009