1. Shirahatti AM, Smith DJ (2015) The effects of long-range residual stress, elastic follow-up and applied load on creep crack incubation and material toughness. J Strain Anal Eng Des, JSA Golden Issue, July 2015, pp 1–15
2. Robinson EL (1955) Steam piping design to minimize creep concentration. Trans ASME 77:1147–1162
3. Shirahatti AM, Truman CE, Smith DJ (2013) Experiments to determine the influence of residual stress and elastic follow-up on creep crack initiation. In: Proceedings of the ASME 2013 pressure vessels & piping conference, Paris, France
4. British Energy Generation Ltd. (2003) Assessment procedure for the high temperature response of structures. R5 Standards, Issue 3
5. Shirahatti AM, Smith DJ (2019) A novel creep test rig to study the effects of long-range residual stress, elastic follow-up and applied load. J Braz Soc Mech Sci Eng 41(230):1–12