Author:
Torres A.,Mahmoudi B.,Darras A. J.,Imanpour A.,Driver R. G.
Reference26 articles.
1. Almusharaf A, Elnimeiri M (2010) A performance-based design approach for early tall building form development. In: 5th international conference proceedings of the Arab society for computer aided architectural design, Illinois Institute of Technology, Chicago, IL, USA, vol 1, pp 39–50
2. Ashworth A, Skitmore M (1983) The effectiveness of estimating in the construction industry, Master’s Degree, The Charted Institute of Building, Englemere, Berkshire, England
3. Barg S, Flager F, Fischer M (2018) An analytical method to estimate the total installed cost of structural steel building frames during early design. J Build Eng 15:41–50
4. Carter C, Schlafly T (2008) “$ave More Money”. Modern Steel Construction, American Institute of Steel Construction
5. Casoli G (1998) S-Frame. V. Enterprise. S-Frame Software Inc. Windows
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献