1. Dailymirror. (2001). Access Engineering begins work as sub-contractor for Gatembe flyover. Dailymorror [Online] Available at: https://www.dailymirror.lk/business-news/Access-Engineering-begins-work-as-sub-contractor-for-Gatembe-flyover/273-215318 (Accessed 01 June 2023).
2. Dianchun Du, Daniel Dias and Ngocanh Do (2020). Effect of surcharge loading on horseshoe-shaped tunnels excavated in saturated soft rocks. Journal of Rock Mechanics and Geotechnical Engineering, 12(2020), pp. 1339-1346
3. Facesupport.org. (n.d.). www.facesupport.org—What is facesupport? [Online] Available at: http://www.facesupport.org/wiki.html (Accessed 31 Oct. 2023).
4. Japan International Cooperation Agency (JICA). (2022). Greater Kandy development plan 2022. Available at: https://www2.jica.go.jp/en/evaluation/pdf/2021_1601602_4_f.pdf (Accessed 4 June 2023).
5. Lu, X., Xu, Z., Huang, M. and Zhou, Y. (2017). Strength reduction finite element analysis of a stability of large cross-river shield tunnel face with seepage. [Online] ResearchGate. China: European Journal of Environmental and Civil Engineering, p.19. Available at: https://www.researchgate.net/publication/320236170_Strength_reduction_finite_element_analysis_of_a_stability_of_large_cross-river_shield_tunnel_face_with_seepage/link/5b7aa3854585151fd1222386/download (Accessed 30 Oct. 2023).