Publisher
Springer Nature Singapore
Reference14 articles.
1. Mahdavian S, Manjunatha KS, Pereira E, Lu M (2020) Guidance to safety-centric construction acceleration planning in the context of project time-cost tradeoff analysis. In: Construction research congress 2020 Tempe, Arizona, USA, vol 1, pp 1186–1193
2. Brown DB (1976) System analysis & design for safety. Prentice-Hall Inc., Englewood Cliffs, New Jersey, USA
3. Goetsch DL (1996) Occupational safety and health in the age of high technology. Prentice-Hall, Englewood Cliffs, New Jersey, USA
4. Holt ASJ (2001) Principles of construction safety. Blackwell Science, London
5. Fung IWH, Tam VWY, Lo TY, Lu LLH (2010) Developing a risk assessment model for construction safety. Int J Project Manage 28(2010): 593–600