1. Harper C, Tran D, Jaselskis E (2019) NCHRP Synthesis 534: emerging technologies for construction delivery. Retrived from: https://www.nap.edu/login.php?action=guest&record_id=25540
2. Shah K, Mitchell A, Lee D, Mallela J (2017) Report No. FHWA-HIF-17–028: Addressing challenges and return on investment (ROI) for paperless project delivery (e-Construction). Retrived from: https://www.fhwa.dot.gov/construction/econstruction/hif17028.pdf
3. Okpala I, Nnaji C, Karakhan AA (2020) Utilizing emerging technologies for construction safety risk mitigation. Pract Period Struct Des Constr 25(2):04020002
4. Yamaura J, Muench ST (2018) Assessing the impacts of mobile technology on public transportation project inspection. Autom Constr 96:55–64
5. Von Q, Rao HL, Minchin C, Nazarian R, Maser SK, Prowell B (2009) NCHRP Report 626: NDT technology for quality assurance of HMA pavement construction. Transportation Research Board of the National Academies, Washington, DC