Author:
Lee Shyue Leong,Mannan Mohammad Abdul,Kwee Ivonson,Kian Chiang Chong
Reference24 articles.
1. Jin Q, Leung CK, Yu C (2013) Effective joining method for pseudo-ductile permanent formwork. Mater Struct 46:345–360
2. Gai X et al (2013) Experimental investigation into a ductile FRP stay-in-place formwork system for concrete slabs. Constr Build Mater 49:1013–1023
3. Hasselhoff J, Cheng L, Waimer F, Gabler M, Knippers J (2015) Design, manufacturing and testing of shear-cone connectors between CFRP stay-in-place formwork and concrete. Compos Struct 129:47–54
4. Bank LC, Malla AP, Oliva MG, Russell JS, Bentur A, Shapira A (2009) A model specification for fiber reinforced non-participating permanent formwork panels for concrete bridge deck construction. Constr Build Mater 23(7):2664–2677
5. Kim H, Lee CJ, Shon CS, Moon H, Chung CW (2020) Mechanical performance and chloride ion penetration of polyolefin fiber reinforced concrete designed for shotcreting at marine environment. J Struct Integr Maint 5(1):8–17
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献