Author:
Liyanaarachchi Nirmala,Akasaka Shingo,Weng Jiahua
Publisher
Springer Nature Singapore
Reference10 articles.
1. Tersine R, Hummingbird E (1995) Lead-time reduction: the search for competitive advantage. Int J Oper Prod Manag 15(2):8–18
2. Willner O, Powell D, Gerschberger M, Schönsleben P (2016) Exploring the archetypes of engineer-to-order: an empirical analysis. Int J Oper Prod Manag 36(3):242–264
3. Weng J, Akasaka S, Hoshino A, Onari S (2015) A study on value setting of product functional specifications with consideration of parts and inventory costs for engineer-to-order production. Asian J Manage Sci Appl 2(1):33–47
4. Liyanaarachchi N, Akasaka S, Weng J (2023) A review of literature on engineer-to-order production systems. Asian J Manage Sci Appl 8(1):53–82
5. Matsumoto R, Yamada T, Takanokura M (2020) Staff scheduling and work allocation considering physical workload in senior daytime care facilities. J Japan Industr Manage Assoc 71(2E):99–110