1. Al Hattab M, Hamzeh F (2013) Information flow comparison between traditional and BIM-based projects in the design phase. In: Proceedings for the 21st annual conference of the international group for lean construction, pp 761–770
2. Ashworth A, Hogg K, Higgs C (2013) Willis’s practice and procedure for the quantity surveyor. Wiley, New York
3. Ballard G (2008) The lean project delivery system: an update. Lean Constr J
4. Ballard G (2009) An update on target value design. In: Lean design forum-lean construction Institute & Project Production System Laboratory
5. Ballard G, Reiser P (2004) The St. Olaf College Fieldhouse project: a case study in designing to target cost. In: 12th annual conference of the international group for lean construction, pp 234–249