1. Alla AA, Quandt M, Lütjen M (2013) Simulation-based aggregate installation planning of offshore wind farms. Int J Energy 72:23–30
2. Backe S, Haugland D (2017) Strategic optimization of offshore wind farm installation. In: Bektaş T, Coniglio S, Martinez-sykora A, Voß S (eds) Computational logistics, ICCL 2017, Lecture Notes in Computer Science, vol 10572. Springer International Publishing, pp 285–299
3. Ballard G (1999) Improving work flow reliability. In: 7th Annual conference of the international group for lean construction, 1999/07/26, Berkeley, USA, pp 275–286
4. Ballard HG (2000) The last planner system of production control. University of Birmingham, Birmingham
5. Barlow E, Tezcaner Ozturk D, Day S, Boulougouris E, Revie M, Akartunali K (2014) An assessment of vessel characteristics for the installation of offshore wind farms. In: International conference on marine technology, ICMT 2014