Author:
Quynh Duong Vu Xuan,Jeenanunta Chawalit,Nakamura Masahiro,Kojima Fumio
Reference14 articles.
1. Alexandros DC, Chrissoleon PT (2009) Exact analysis of a two-workstation one-buffer flow line with parallel unreliable machines. Eur J Oper Res 197(2):572–580
2. Ameen W, Alkahtani M, Mohammed MK, Abdulhameed O, El-Tamimi AM (2018) Investigation of the effect of buffer storage capacity and repair rate on production line efficiency. J King Saud Univ Eng Sci 30(3):243–249
3. Andijani A, Anwarul M (1997) Manufacturing blocking discipline: a multi-criterion approach for buffer allocations. Int J Prod Econ 51(3):155–163
4. El-tamimi A., Savsar M (1987) The availability of a two-stage production line with intermediate buffer. IASTED Reliability and Quality Control Conference, 24–26 June, Paris, France, pp 117–120
5. Gupta T, Houshyar A (1990) Consideration of instage and central buffers in two-stage production system. Comput Ind Eng 19(1–4):427–431