Author:
Wang Meng,Shi Fangyu,Dong Ziqi,Lu Hongxia
Publisher
Springer Nature Singapore
Reference14 articles.
1. Caprara, A., Fischetti, M., Toth, P.: Modeling and solving the train timetabling problem. Oper. Res. 50(5), 851–861 (2002)
2. Zhou, X., Zhong, M.: Single-track train timetabling with guaranteed optimality: branch-and-bound algorithms with enhanced lower bounds. Transp. Res. Part B: Methodol. 41(3), 320–341 (2007)
3. Li, S., Lv, H., Xu, C., et al.: Optimized train path selection method for daily freight train scheduling. IEEE Access 8, 40777–40790 (2020)
4. Reisch, J., Großmann, P., Pöhle, D., et al.: Conflict resolving–A local search algorithm for solving large scale conflict graphs in freight railway timetabling. Eur. J. Oper. Res. 293(3), 1143–1154 (2021)
5. Shi, F., Li, X.H., Qin, J., Deng, L.B., et al.: A timing-cycle iterative optimizing method for drawing single-track railway train diagrams. J. China Railw. Soc. 27(1), 1–5 (2005)