Author:
Mat Isa Siti Sarah,Mat Salleh Norazlin,Wan Ismail Wan Norizan,Zainal Abidin Zaiwainnizar,Md. Zain Noraini
Reference38 articles.
1. Abdullah MR, Aziz AAA, Rahman IA (2009) Potential effects on large MARA projects due to construction delay. Int J Integr Eng (Issue on Civ Environ Eng) 1:53–62
2. Abidin NZ, Pasquire CL (2007) Revolutionize value management: a mode towards sustainability. Int J Project Manage 25(3):275–282
3. Abidin NZ (2009) Sustainable Construction in Malaysia – Developers Awareness. In: Proceedings of world academy of science, engineering and technology, 5:122–129
4. Abidin NZ (2010) Investigating the awareness and application of sustainable construction concept by Malaysian developers. Hab Int 34(4):421–426. http://doi.org/10.1016/j.habitatint.2009.11.011
5. Amlus MH et al (2014) Industrialized building system (IBS) performance in Malaysian Construction Industry: analysing the cost, training and construction project. J Appl Sci Agric 9(13):6–13
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献