Publisher
Springer Nature Singapore
Reference17 articles.
1. Project implementation status report of central sector projects costing Rs. 150 crore & above-22 (QTR-2nd) port trust-setting up of LNG regasification terminal at Puthuvypeen Cochin
2. Government of India ministry of road transport and highways annual report
3. Vigneshwaran P, Arunpandiyan M, Ashwinkumar C, Balaji M, Chandrasekaran R (2019) A study on construction challenges of bridges in the hilly areas of Tamil Nadu 1
4. Fredriksson A, Sezer AA, Angelakis V, Gundlegård D (2022) Construction related urban disturbances: Identification and linking with an IoT-model. Autom Constr 134. https://doi.org/10.1016/j.autcon.2021.104038
5. Li ZY (2014) Research on the risk assessment in bridge construction stage. Adv Mater Res 855–859. https://doi.org/10.4028/www.scientific.net/AMR.1030-1032.855