Resource Buffers in Construction Projects
Author:
Publisher
Springer Singapore
Link
http://link.springer.com/content/pdf/10.1007/978-981-15-8293-6_37
Reference12 articles.
1. Deming WE (1982) Out of the crisis. MIT
2. Goldratt E (1997) Critical chain. North River Press, Massachusetts
3. Herroelen W, Leus R (2001) On the merits and pitfalls of critical chain scheduling. J Oper Manag 19(5):559–577
4. Leach LP (2005) Lean project management: eight principles for success. Idaho, Advanced Projects, Inc., Boise, Idaho
5. Lechler TG, Ronen B, Stohr EA (2005) Critical chain: a new project management paradigm or old wine in new bottles? Eng Manag J 17(4):45–58
Cited by 10 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. GIS Based 4D Model For G+2 Residential Building Project;E3S Web of Conferences;2023
2. A fuzzy project buffer management algorithm: a case study in the construction of a renewable project;International Journal of Construction Management;2022-03-09
3. Risk Assessment and Management in Construction Industry;Lecture Notes in Civil Engineering;2022
4. Risk Assessment in Construction Industry Using a Fuzzy Logic;Lecture Notes in Civil Engineering;2022
5. Analysing Construction and Demolition Waste Practices: An Indian Case Study;Lecture Notes in Civil Engineering;2022
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3