Author:
Han Zhonghua,Wang Shiyao,Dong Xiaoting,Ma Xiaofu
Reference11 articles.
1. M. Wang, R.Y. Zhong, Q. Dai, G.Q. Huang, A MPN-based scheduling model for IoT-enabled hybrid flow shop manufacturing. Adv. Eng. Inform. (2016)
2. D. Lei, X. Guo, Hybrid flow shop scheduling with not-all-machines options via local search with controlled deterioration. Comput. Oper. Res. 65 (2016)
3. T.S. Arthanari, K.G. Ramamurthi, A branch and bound algorithm for sequencing n jobs on m parallel processors. Opsearch 7, 147–156 (1970)
4. Z. Han, X. Ma, L. Yao, H. Shi, Cost optimization problem of hybrid flow-shop based on PSO algorithm. Adv. Mater. Res. 532–533, 1616–1620 (2012)
5. P. Fattahi et al., A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations. ScienceDirect 119–134 (2014)
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献