Author:
Guo Dong,Li Jinhui,Jiang Shui-Hua,Li Xu,Chen Zuyu
Funder
shenzhen key laboratory launching project
National Key R&D Program of China
Shenzhen Peacock Technology Innovation Project
Publisher
Springer Science and Business Media LLC
Subject
Earth and Planetary Sciences (miscellaneous),Geotechnical Engineering and Engineering Geology
Reference19 articles.
1. Alber M (2000) Advance rates of hard rock TBMs and their effects on project economics. Tunn Undergr Space Technol 15(1):55–64
2. Bastian A, Sujadi H, Febrianto DG (2018) Penerapan algoritma K-means clustering analysis pada aenyakit menular manusia (Studi Kasus Kabupaten Majalengka). Jurnal Sistem Informasi 14(1):28–34
3. Breiman L (2001) Random forests. Mach Learn 45(1):5–32
4. Bruland A (1998) Hard rock tunnel boring. D.E. thesis, Norwegian University of Science and Technology
5. Chen K, Sun ZC, Li T (2018) TBM design and construction. China Communications Press Co. Ltd, Beijing
Cited by
54 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献