1. C.D. Hu, NBI Work Team, The Physical Scheme of EAST Neutral Beam Injection System (ASIPP, China, 2009)
2. C.D. Hu, Y.H. Xie, Y.L. Xie et al., Plasma Sci. Technol 13, 541 (2011)
3. C.D. Hu, Y.H. Xie, Y.L. Xie, Development of Long Pulse Neutral Beam Injector System for the EAST Tokamak (Chinese Nuclear Society Fall Meeting, Beijing, China, 2009)
4. L. Martinez_Laso, M. Liniers, J. Alonso et al., Fusion Eng. Design 56-57, 477–480 (2001)
5. P. Sheng, C.D. Hu, NBI Work Team, The Scheme of NBICS (ASIPP, China, 2012)