1. Béland, B., “Examination of Electrical Conductors Following a Fire,”Fire Technology, Vol. 16, No. 4 (November 1980), pp. 252–258.
2. Bisson, A. J., “Electric Systems for Commercial Building,” The Institute of Electrical and Electronics Engineers, New York (1964), p. 63.
3. “IEEE Recommended Practice for Grounding of Industrial and Commercial Power Systems,” American National Standards Institute, C114.4-1973 and IEEE Std 142-1972, New York, p. 15, Article 1.3.3.
4. Dewan, S. B. and Straughen, A.,Power Semiconductor Circuits, John Wiley and Sons, Toronto (1975), pp. 94–111.
5. Report No. 69-C-137;G. A. Farrall,1969