1. Bensana, E., Bel, G. and Dubois, D. (1988) OPAL: a multi knowledge-based system for industrial job-shop scheduling.International Journal of Production Research,26, 795?819.
2. Brooks, D. G. and White, C. R. (1965) An algorithm for finding optimal or near-optimal solutions to the production scheduling problem.Journal of Industrial Engineering,16.
3. Buntine, W. and Stirling, D. (1988) Interactive induction, inProceedings of the Fourth International Conference on Artificial Intelligence Applications, California, pp. 320?6.
4. Chakravarty, A. K. and Shtub, A. (1984) Selecting parts and loading FMS, inProceedings of the First ORSA/TIMS Conference on FMS, Ann Arbor, Michigan, pp. 284?9.
5. Chang, Y.-L. and Sullivan, R. S. (1984) Real-time scheduling of flexible manufacturing systems, inPaper presented at ORSA/TIMS meeting, San Francisco, California.