1. Paulay, T., ‘Equilibrium criteria for reinforced concrete beam-column joints’,ACI Structural Journal 86 (6) (1989) 635–643.
2. Guimaraes, G.N., Kreger, M.E. and Jirsa, J.O., ‘Evaluation of joint-shear provisions for interior beam-column-slab connections using high-strength materials’,Ibid. 89 (1) (1992) 89–98.
3. Raffaelle, G.S. and Wight, J.K., “Reinforced concrete eccentric beam-column connections subjected to earthquake-type loading’,Ibid. 92 (1) (1995) 45–55.
4. Cheok, G.S. and Lew, H.S., ‘Performance of precast concrete beam-to-column connections subject to cyclic loading’,PCI Journal 36 (3) (1991) 56–67.
5. Cheok, G.S. and Lew, H.S., ‘Model precast concrete beam-to-column connections subject to cyclic loading’,Ibid. 38 (4) (1993) 80–92.