Funder
5511 Science and Technology Innovation Talent Project of Jiangxi Province
The Project of National Key Research & Development
Publisher
Springer Science and Business Media LLC
Reference32 articles.
1. Khaleghi, B., et al.: Accelerated bridge construction in Washington State: from research to practice. PCI J. 57(4), 34–49 (2012)
2. Culmo, M.P., et al.: Accelerated Bridge Construction: Experience in Design, Fabrication and Erection of Prefabricated Bridge Elements and Systems: Final Manual. No. FHWA-HIF-12-013. United States. Federal Highway Administration. Office of Bridge Technology (2011)
3. Gao, W., et al.: Microstructural and mechanical performance of underwater wet welded S355 steel. J. Mater. Process. Technol. 238, 333–340 (2016)
4. Billington, S.L.; Breen, J.E.: Improving standard bridges with attention to cast-in-place substructure. J. Bridge Eng. 5(4), 344–351 (2000)
5. Billington, S.L.; Barnes, R.W.; Breen, J.E.: Alternate substructure systems for standard highway bridges. J. Bridge Eng. 6(2), 87–94 (2001)
Cited by
25 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献