Author:
Arif S.,Mohammedi R. D.,Hellal A.,Choucha A.
Publisher
Springer Science and Business Media LLC
Reference17 articles.
1. Wood A.J., Wollenberg B.F.: Power Generation, Operation and Control. 2nd edn. Wiley, New York (1996)
2. Bard J.F.: Short-term scheduling of thermal-electric generators using Lagrangian relaxation. Oper. Res. 36(5), 756–766 (1988)
3. Mohammedi, R.D.: Etude du problème d’Engagement de Turbines (Unit Commitment) par la Programmation Dynamique et autres Techniques Avancées. In: Mémoire de Magister, Université Ammar Télidji de Laghouat, Algérie, Juin (2008)
4. Kazarlis S.A., Bakirtzis A.G., Petridis V.: A genetic algorithm solution to the unit commitment problem. IEEE Trans. Power Syst. 11(1), 83–92 (1996)
5. Simon P.S., Padhy N., Anand R.S.: An ant colony system approach for unit commitment problem. Electr. Power Syst. Res. 28(5), 315–323 (2006)
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献