Publisher
Springer Science and Business Media LLC
Reference72 articles.
1. Aliahmadi, A.; Gharemani-Nahr, J.; Nozari, H.: Flexible flow shop scheduling with forward and reverse flow under uncertainty using the red deer algorithm. J. Ind. Eng. Manag. Stud. 10(1), 16–33 (2023)
2. Allali, K.; Aqil, S.; Belabid, J.: Distributed no-wait flow shop problem with sequence dependent setup time: optimization of Makespan and maximum tardiness. Simul. Model. Pract. Theory 116, 102455 (2022)
3. Almeida, FSd.; Nagano, M.S.: Heuristics to optimize total completion time subject to Makespan in no-wait flow shops with sequence-dependent setup times. J. Oper. Res. Soc. 74(1), 362–373 (2023)
4. Aqil, S.; Allali, K.: On a bi-criteria flow shop scheduling problem under constraints of blocking and sequence dependent setup time. Ann. Oper. Res. 296(1), 615–637 (2021)
5. Arık, O.A.: Artificial bee colony algorithm including some components of iterated greedy algorithm for permutation flow shop scheduling problems. Neural Comput. Appl. 33(8), 3469–3486 (2021)
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献