1. ACS Symposium Series;J. Almhof,1987
2. Recently (Cray Research Inc. press release November 18, 1987), Seymour Cray projected the performance of his CRAY-4, which is now in its initial planning stage, to be 1000 times that of the CRAY-1 delivered in 1976. If we assume a typical development cycle of 5 years, a factor of 1000 in throughput performance would have then been achieved within about two decades.
3. Hohenberg, P. and Kohn, W., Phys. Rev. B 136 (1964) 864–871.
4. Kohn, W. and Sham, L.J., Phys. Rev. A, 140 (1965) 1133–1138.
5. ACS Symposium Series;E. Wimmer,1987