Publisher
Springer Science and Business Media LLC
Reference45 articles.
1. Allen D (2003) Getting things done, the art of stress-free productivity. Penguin Books, London, p 41
2. Baptiste P, Croce FD, Grosso A, Tkindt V (2010) Sequencing a single machine with due dates and deadlines: an ilp-based approach to solve very large instances. J Sched 13:39–47. https://doi.org/10.1007/s10951-008-0092-6
3. Brahimi N, Absi N, Dauzre-Prs S, Nordli A (2017) Single-item dynamic lot-sizing problems: an updated survey. Eur J Oper Res 263(3):838–863. https://doi.org/10.1016/j.ejor.2017.05.008
4. Brucker P (2007) Scheduling algorithms. Springer, Berlin
5. Ceschia S, Gaspero LD, Schaerf A (2017) Solving discrete lot-sizing and scheduling by simulated annealing and mixed integer programming. Comput Ind Eng 114:235–243. https://doi.org/10.1016/j.cie.2017.10.017
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献