1. H. Adelsberger and J.J. Kanet, The Leitstand — a new tool for computer-integrated manufacturing, Prod. Inventory Manag. 1 (1991) 43.
2. J.C. Bean and J.R. Birge, Match-up real-time scheduing, Department of Industry and Operations-Engineering, University of Michigan (1985).
3. B.D. Becker and W. Dangelmaier, EXCON — an expert system to construct control strategies for simulation systems in manufacturing, in:Proc. 1986 Summer Computer Simulation Conf., eds. R. Crosbie and P. Luker (SCS, San Diego, 1986) p. 731.
4. R. Belz, SIMULEX — solving rescheduling problems by knowledge-based simulation, in:Proc. 1992 European Simulation Symp., Simulation and AI in Computer-Aided Techniques, eds. W. Krug and A. Lehmann (SCS, San Diego, 1992) p. 371.
5. Working Paper;R. Belz,1992