1. T. Altiok, Production lines with phase-type operation and repair times and finite buffers, Int. J. Prod. Res. 23 (1985) 489?498.
2. A. Bobbio and K.S. Trivedi, Computation of the completion time when the work requirement is a PH random variable,Int. Conf. on Analysis and Control of Large Scale Stochastic Systems, Chapel Hill, NC (1988).
3. J.A. Buzacott, Automatic transfer lines with buffer stocks, Int. J. Prod. Res. 5 (1967) 182?200.
4. J.A. Buzacott and L.E. Hanifin, Models of automatic transfer lines with inventory banks: A review and comparison, II Trans. 10 (1978) 197?207.
5. J.A. Buzacott and L.E. Hanifin, Transfer line design and analysis: An overview,1978 Fall IE Conference (1978) pp.277?286.