Publisher
Springer Science and Business Media LLC
Reference16 articles.
1. Bathaee, K. and Gholami, M. (2016). Design process of change of functioning of a power shovel to a lattice boom crane of 300–ton capacity. SAE Paper No. 2016–01–8126.
2. Bechtel Equipment Operations, Inc. (2002). Bechtel Rigging Handbook. 2nd edn. USA.
3. Dassault Systèmes (2011). ABAQUS Analysis User’s Manual 6.11. Dassault Systèmes Simulia Corp., Providence, RI, USA.
4. Jang, I. G., Kim, K. S. and Kwak, B. M. (2014). Conceptual and basic designs of the Mobile Harbor crane based on topology and shape optimization. Structural and Multidisciplinary Optimization
50, 3, 505–515.
5. Jeng, S. L., Yang, C. F. and Chieng, W. H. (2010). Outrigger force measure for mobile crane safety based on linear programming optimization. Mechanics Based Design of Structures and Machines
38, 2, 145–170.
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献