Abstract
AbstractRoadway support can effectively improve the stability of roadway excavation and ensure the safety of underground mining. This study investigates the secondary support time and parameter optimization of combined support for a deep roadway in the stage of resource replacement in the Huize lead–zinc mine in Yunnan Province, China. The aim of this study is to increase the stability and safety of the roadway and decrease the cost of support. Research on support methods and failure modes has shown that under the action of high in-situ stress in deep mining, the surrounding rock of the roadway exhibits obvious rheological phenomena. The change in the radial displacement of the roadway is combined with creep tests of the main exposed surrounding rock to determine the secondary support time. Numerical simulations and orthogonal tests are utilized to optimize the support parameters in terms of the roof subsidence, floor heave displacement, side displacement, and plastic zone by analyzing the effects of the sprayed concrete thickness, bolt length, bolt row spacing, and bolt diameter on the support results. The proposed secondary support time and combined parameters can provide a reference for roadway support in similar strata.
Funder
national natural science foundation of china
Natural Science Foundation Project of Chongqing, Chongqing Science and Technology Commission
state key laboratory of coal mine disaster dynamics and control
Scientific Research Foundation of Hunan Provincial Education Department
Publisher
Springer Science and Business Media LLC
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献