Constraint programming for reservoir operation optimization of Bhumibol dam

Author:

Sawangphol Wudhichart,Kraisangka Jidapa,Rittima Areeya,Phankamolsil Yutthana,Tabucanon Allan Sriratana,Talaluxmana Yutthana,Vudhivanich Varawoot

Abstract

AbstractThe modern constraint programming (CP) was adopted to minimize water scarcity and excessive water which are the critical issues in reservoir operation of Bhumibol Dam (BB) to solve consecutive droughts in the Chao Phraya River Basin (CPYRB), Thailand. The situations of the severe droughts have been frequently occurred in a broad area of CPYRB due to an extremely low rainfall leading to unusually low water levels and inflow in major reservoirs. Therefore, multi-objective optimization was conducted to characterize the actual operation and physical reservoir system of BB Dam. Two different CP models with seasonal and yearly constraints were manipulated using MiniZinc programming language and the constraint solver IPOPT to find the optimal daily release scheme from 2000 to 2018 of BB Dam. The potential of downstream flow conditions was also considered to partially supply downstream water demand and store savable water in a reservoir for subsequent use during possible future droughts. The results reveal that CP models can diminish some extent of yearly reservoir release, while daily long-term release scheme conforms well with the actual operation particularly during dry and wet seasons in specific drought years. These mean that amount of reservoir water of approximately 47.12–103.83 MCM/year can be saved and stored in reservoir for subsequent use in CPYRB when CP models are deployed. This results in a reservoir storage increase of 7.10–7.94% at the end of the wet season for seasonal and yearly CP models, respectively. When potential side flow is considered, the increase climbs up to 10.49%. This envisages the higher possibility of supplying reservoir water for agricultural water needs over the dry season in the Greater Chao Phraya Irrigation Scheme. As the potential hydraulic head is subject to increased reservoir water storage, therefore, the increase in hydropower production is definitely found of ranging from + 6.10% to + 13.79% by these two sorts of CP models. In addition, handling with huge volumes of flood and drought by CP models is well managed as the specific release constraints during refilled and drawdown periods are used to define the constraint satisfaction problem.

Funder

Thailand Science Research and Innovation

Mahidol University

Publisher

Springer Science and Business Media LLC

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3