1. Abdelrhman, M. A., B. J. Bergen, andW. G. Nelson. 1998. Modeling of PCB concentrations in water and biota (Mytilus edulis) in New Bedford Harbor, Massachusetts.Estuaries 21: 435–448.
2. Abdelrhman, M. A. andE. H. Dettmann. 1997. Two-dimensional modeling of current circulation and contaminant transport in surface waters, p. 117–123.In G. Delic (ed.), Next Generation Environmental Models and Computational Methods. Society of Industry and Applied Mathematics, Philadelphia, Pennsylvania.
3. Apicella, G., R. Norris, J. Newton, W. Ewald, andA. Forndran. 1994. East River modeling of water quality for multiple-project assessment, p. 235–248.In M. Spaulding (ed.), Proceedings of the Third International Conference-Estuarine and Coastal Modeling III. The American Society of Civil Engineers, New York.
4. Technical Report (ASA, 86-18);Applied Science Associates, Inc.,1987
5. Aubrey, D. 1995. Estimation of flushing rates in selected Buzzards Bay embayments. Prepared by Aubrey Consulting Incorporated, Cataumet, Massachusetts, for Buzzards Bay Project, Marion, Massachusetts.