Author:
Alfieri A.,Brandimarte P.
Reference58 articles.
1. Ahmed, S., King, A.J., and Parija, G. (2003). A multi-stage stochastic integer programming approach for capacity expansion under uncertainty. Journal of Global Optimization, 26: 3–24.
2. Alfieri, A. and Brandimarte, P. (1999). Production planning in an assembly-to-order environment by two-stage stochastic linear programming. Proceedings of the IV Aitem Conference, Brescia, 151–158.
3. Alfieri, A., Brandimarte, P., and d’Orazio, S. (2002). LP-based heuristics for the capacitated lot-sizing problem: the interaction of model for-mulation and solution algorithm. International Journal of Production Research, 40: 441–458.
4. Artzner, P., Delbaen, F., Eber, J.-M., and Heath, D. (1999). Coherent measures of risk. Mathematical Finance, 9: 203–228.
5. Bakir, M.A. and Byrne, M.D. (1998). Stochastic linear optimisation of an MPMP production planning model. International Journal of Production Economics, 55: 87–96.
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献