1. S.K.PARK, T.A.STRAETER, J.E.HOGGE, An analytic study of near terminal area optimal sequencing and flow control techniques. Agard CP 1O5.
2. R.W. CONWAY, W.L. MAXWELL, L.W. MILLER, Theory of Scheduling. Addison-Wesley, Reading, Mass., USA, 1967.
3. K.R.BAKER, Procedures for sequencing tasks with one resource type. Int.J.Prod. Res., Vol.11, n.2, 125–138.
4. J.SHWIMER, On the N-job, one-machine, sequence independent scheduling problem with tardiness penalties:a branch-bound solution. Mgmt.Sci., vol.18,n.6, Feb. 1972.
5. G.RINALDI, A.SASSANO, On a job scheduling problem with different ready times:some properties and a new algorithm to determine the optimal solution. Centro di Studio dei Sistemi di Controllo e Calcolo Autom. C.N.R. Roma.R 77-24. To appear.