1. Abdul Rahman, I., Memon, A. H., Karim, A., and Tarmizi, A. (2013). “Significant factors causing cost overruns in large construction projects in Malaysia.” Journal of Applied Science. November 11, 2015(http://eprints.uthm.edu.my/4306/1/ismail_abdul_rahman_2_U. pdf).
2. Akinci, B. and Fischer, M. (1998). “Factors affecting contractors’ risk of cost overburden.” Journal of Management in Engineering, Vol. 14, No. 1, pp. 67–76, DOI: 10.1061/(ASCE)0742-597X(1998)14:1(67).
3. An, M. (2015). “The VND/USD Rose to Its Highest Level for 11 Years.” thoibaotaichinhvietnam. Retrieved (http://thoibaotaichinhvietnam. vn/pages/tien-te-bao-hiem/2015-05-13/ty-gia-vnd-usd-tang-len-muc-caonhat-11-nam-20722.aspx).
4. Benjaoran, V. and Intarasap, A. (2013). “Hospital Renovation Construction Project Scheduling with Special Relationships (ASCE).” Proceeding (ICCREM 2013):258–70. Retrieved November 5, 2015 (http://ascelibrary.org/doi/abs/10.1061/9780784413135.024).
5. Chang, A. S. T. (2002). “Reasons for cost and schedule increase for engineering design Projects.” Journal of Management in Engineering, Vol. 18, No. 1, pp. 29–36, DOI: 10.1061/(ASCE)0742-597X(2002)18:1(29).