1. Azar, E. R., Agnew, G., and Parker, A. (2015). “Effectiveness of automated machine guidence technology in productivity improvement: Case study.” Proceedings of ICSC15: The Canadian Society for Civil Engineering 5
th
International/11
th
Construction Specialty Conference, University of British Columbia, Vancouver, Canada, pp. 269–1–269–10, DOI: 10.14288/1.0076433.
2. Bogenberger, C., Dell’Amico, M., Fuellerer, G., Hoefinger, G., Iori, M., Novellani, S., and Panicucci, B. (2015). “Two-phase earthwork optimization model for highway construction.” Journal of Construction Engineering and Management, Vol. 141, No. 6, pp. 05015003, DOI: 10.1061/(ASCE)CO.1943-7862.0000973.
3. California Department of Transportation (CADOT). “Automated machine guidance.” Available online:
https://doi.org/www.dot.ca.gov/hq/construc/amg/
(accessed on 12 December 2017).
4. Chau, K. W., Anson, M., and Zhang, J. P. (2004). “Four-dimensional visualization of construction scheduling and site utilization.” Journal of Construction Engineering and Management, Vol. 130, No. 4, pp. 598–606, DOI: 10.1061/(ASCE)0733-9364(2004)130:4(598).
5. Du, J. C. and Teng, H. C. (2007). “3D laser scanning and GPS technology for landslide earthwork volume estimation.” Automation in Construction, Vol. 16, No. 5, pp. 657–663, DOI: 10.1016/j.autcon.2006.11.002.