A multi-objective DCP model for bi-level resource-constrained project scheduling problems in grounding grid system project under hybrid uncertainty
Author:
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Link
http://link.springer.com/content/pdf/10.1007/s12205-015-0615-6.pdf
Reference43 articles.
1. Acharya, N., Lee, Y., and Choi, S. (2006). “Key Attitude Indicators (KAI) for measuring attitude of contractors in construction projects.” KSCE Journal of Civil Engineering, Vol. 10, No. 6, pp. 151–163, DOI: 10.1007/BF02824056 .
2. Ai, T. and Kachitvichyanukul, V. (2009). “A particle swarm optimization for the vehicle routing problem with simultaneous pickup and delivery.” Computers & Operations Research, Vol. 36, No. 5, pp. 1693–1702, DOI: 10.1016/j.cor.2008.04.003 .
3. Ashtiani, B., Leus, R., and Aryanezhad, M. (2011). “New competitive results for the stochastic resource-constrained project scheduling problem: Exploring the benefits of pre-processing.” Journal of Scheduling, Vol. 14, No. 2, pp. 157–171, DOI: 10.1007/s10951-009-0143-7 .
4. Ben-Ayed, O. and Blair, C. (1990). “Computational difficulties of bilevel linear programming.” Operation Research, Vol. 38, pp. 556–560, DOI: 10.1287/opre.38.3.556 .
5. Bianco, L. and Caramia, M. (2012). “An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations.” European Journal of Operational Research, Vol. 219, No. 1, pp. 73–85, DOI: 10.1016/j.ejor.2011.12.019 .
Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. A new approach for production project scheduling with time-cost-quality trade-off considering multi-mode resource-constraints under interval uncertainty;International Journal of Production Research;2022-09-07
2. Optimization for Project Scheduling;Application of Mathematics and Optimization in Construction Project Management;2021
3. A Lyapunov Drift-Plus-Penalty-Based Multi-Objective Optimization of Energy Consumption, Construction Period and Benefit;KSCE Journal of Civil Engineering;2020-08-24
4. Work package-based information modeling for resource-constrained scheduling of construction projects;Automation in Construction;2020-01
5. A bi-level fuzzy random model for multi-mode resource-constrained project scheduling problem of photovoltaic power plant;Journal of Renewable and Sustainable Energy;2019-05
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3