Author:
Oh Chi Don,Park Chansik,Kim Kyong Ju
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference26 articles.
1. Bell, L. C. and Kaminsky, A. (1987). “Data base for preliminary cost estimation.” Journal of Transportation Engineering, ASCE, Vol. 113, No. 4, pp. 341–347.
2. Carr, R. I. (1989). “Cost-estimation principles.” Journal of Construction Engineering and Management, ASCE, Vol. 115, No. 4, pp. 545–551.
3. Flyvbjerg, B., Holm, M. S., and Buhl, S. (2002). “Underestimation costs in public works projects: Error or lie?.” Journal of the American Planning Association, APA, Vol. 68, No. 3, pp. 279–295.
4. Hartgen, D. T. and Talvitie, A. P. (1995). “Comparative performance of transportation systems: Pitfalls and prospects.” Proc., World Conf. on Transit Research, Sydney, Australia.
5. Hegazy, T. and Ayed, A. (1998). “Neural network model for parametric cost estimation of highway projects.” Journal of Construction Engineering and Management, ASCE, Vol. 124, No. 3, pp. 210–218.
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献