1. Al-Bahar, J. F., and Crandall, K. C. (1990). “Systematic risk management approach for construction projects.” Journal of Construction Engineering and Management, Vol. 116, No. 3, pp. 533–546.
2. Ali, T. H., Stewart, R. A., and Qureshi, S. (2007). “Evaluating risk management practices in the pakistani construction industry: The current state of play.” Proceedings of the Fourth International Conference on Construction in the 21st Century: Accelerating Innovation in Engineering, Management and Technology.
3. Aloini, D., Dulmin, R., and Mininno, V. (2007). “Risk management in ERP project introduction: Review of the literature.” Information & Management, Vol. 44, No. 6, pp. 547–567.
4. An, M., Baker, C., and Zeng, J. (2005). “A fuzzy-logic-based approach to qualitative risk modeling in the construction process.” World Journal Engineering, Vol. 2, No. 1, pp. 1–12.
5. Assaf, S. A. and Al-Hejji, S. (2006). “Causes of delay in large construction projects.” International Journal of Project Management, Vol. 24, No. 4, pp. 349–357.