Author:
Yu Wen-Der,Wang Zhi-Lei,Chang Hsien-Kuan,Cheng Tao-Ming
Publisher
Springer Science and Business Media LLC
Reference36 articles.
1. Alarcón LF, Mourgues C (2002) Performance modeling for contractor selection. Journal of Construction Engineering and Management 18:2(52),18:2(52):52–60, DOI: https://doi.org/10.1061/(ASCE)0742-597X(2002)18:2(52)
2. Bucciol A, Chillemi O, Palazzi G (2013) Cost overrun and auction format in small size public works. European Journal of Political Economy 30:35–42, DOI: https://doi.org/10.1016/j.ejpoleco.2013.01.002
3. Chang JR (2015) Performance records system for public construction contractors—application of smooth roads project. Journal of Construction Engineering and Management 136(5):06015004–1~9, DOI: https://doi.org/10.1061/(ASCE)CF.1943-5509.0000793
4. Cox A, Ireland P, Townsend M (2006) Managing in construction supply chains and markets: Reactive and proactive options for improving performance and relationship management. Thomas Telford Publishing, London, UK
5. Crowley LG, Hancher DE (1995) Evaluation of competitive bids. Journal of Construction Engineering and Management 121(2):238–245, DOI: https://doi.org/10.1061/(ASCE)0733-9364(1995)121:2(238)